• C罗破纪录!世界杯历史第4人 连续9届大赛破门 2019-07-13
  • 男人公共场合“石更”了怎么办?丨叨可特先生 2019-07-01
  • 强化“五大建设”  增强“四个意识”br为推进辽宁振兴发展提供坚强思想政治保证 2019-07-01
  • 户口迁移耽搁了17年 诸暨籍女子找回“迟到”的身份 2019-06-28
  • 广州市妇联:有力推进公共场所母婴室建设 2019-06-21
  • 小萌们自认为能达到计划经济的要求么?你们那点小心思谁不知道?就是想跟着混! 2019-06-21
  • 国家统计局:服务业企业经营收入增长加快 利润增长 2019-06-17
  • 【专题】社会主义核心价值观主题微电影优秀作品展示 2019-06-01
  • “甄傻”治沙:15年植树600万株,9万亩沙岛变绿洲  2019-06-01
  • 秦存良的专栏作者中国国家地理网 2019-05-21
  • 述评:美国应当记取历史教训 2019-05-16
  • 手绘长卷:习近平2018年两会全纪录(动图) 2019-05-16
  • 回复@寻找失落的真理:跟你的铁环玩去!咱真的没兴趣碾压你也。 2019-05-03
  • 粤港澳大湾区可建重大技术产业联盟 2019-05-01
  • 马航客机在乌俄边界被击落事件回顾 2019-05-01
  • Wszystkie produkty
    TEL
    +86 (25) 57120866
    Language
    • chinese
    • English
    Quality Assurance is a way of preventing mistakes or defects in
    products or services while avoiding problems when delivering solutions to customers.
     
    ASN has built a reputation and committed to produce top quality transformers and coil inductors. We have two principles in QA, "Fit for purpose", the product should be suitable for the intended purpose; and "Right first time", mistakes should be eliminated.
     
    QA refers to administrative and procedural activities implemented in a quality system so that requirements and goals for a product, service or activity will be fulfilled. It is the systematic measurement, comparison with a standard, monitoring of processes and an associated feedback loop that confers error prevention.
     
    FMEA
     
    A high level of quality is assured every stage of design development and the manufacturing processes via failure modes and effects analysis (FMEA).
     
    All those planned and systematic actions necessary to provide confidence that a product or facility will perform satisfactorily in service. Quality assurance addresses the overall problem of obtaining the quality of a service, product, or facility in the most efficient, economical, and satisfactory manner possible.
     
    Those quality assurance actions and considerations necessary to assess production and construction processes so as to control the level of quality being produced in the end product.
     
    EN61558 International Standard
     
    Safety of power transformers, power supplies, reactors and similar products – Part 1:
    General requirements and tests
     
    All insulation material pass IEC 60216
    20,000 hours temperature index testing
    1,680 hours heat running test under 150°C
    48 hours 95% humidity treatment
    Short circuit temperature under 175°C
     
    Temperature Rise Testing
    1) Thermal couple;
    2) Resistance method
    dt=(R2-R1)/R1*(234.5+t1)-(t2-t1)
     
    Output Regulation Test
    Adjust the output to rated output (rated voltage and rated current); turn the input to rated input, check the output voltage again to make sure the deviation should be less than 10%.
     
    Reliabilit y Test
    Temperature / Humidity
    Solderability
    Flammability
    Thermal shock

     

    699 Fangzhou Rd.,
    Xiongzhou Town, Luhe ,
    Nanjing, Jiangsu, China,
    211500

    Tel: +86-25-57120866
    Fax: +86-25-57118989
    www.asntransformer.com
    [email protected]